02Elapsed versus clock time

The task finishes. When does the next one begin?

A 30-minute interval and a half-hour cron expression can drift apart even when their first occurrence is identical.

Work takes time

Intervals advance from completion.

For the pinned Hermes implementation, a completed run records its completion time and computes the next occurrence from it. An interval adds its duration to that reference. A cron expression instead finds a matching future wall-clock time. MinuteField lets you supply a constant assumed task duration to make the difference visible.

Created at 12:00 UTC; every run succeeds and takes five minutes
ScheduleFirst startSecond startThird start
30m12:3013:0513:40
*/30 * * * *12:3013:0013:30

The first interval run finishes at 12:35. Adding 30 minutes yields 13:05. For the cron schedule, the next matching slot after 12:35 is 13:00. The calendar shows starts; opening an event also shows its assumed completion.

Change the five-minute assumption →

A longer run

Skipped clock slots are not overlapping appointments.

Change the assumed duration to 40 minutes. A 12:30 run finishes at 13:10. The interval’s next start becomes 13:40; the half-hour cron expression next matches 13:30. This rehearsal is a sequential calculation: it advances after a completed run and does not invent a second concurrent run at 13:00.

Use two independent schedules to compare strategies. Give them descriptive labels such as “30 minutes after work” and “half-hour boundaries.” A shared label or color is not evidence that the jobs are equivalent.

The assumed duration is a constant across every projected occurrence. It does not estimate a language model’s latency, a tool’s execution time or network delays. Try a short and a long plausible duration to understand sensitivity; do not interpret either scenario as a performance forecast.

What is missing

A calendar is not the scheduler’s execution history.

Real execution can depend on gateway availability, queueing, manual triggers, retries, task failures, provider limits and missed-fire policy. Those mechanisms can change what actually runs. MinuteField deliberately labels each result as a nominal occurrence under successful sequential completion.

An empty month can also be an ordinary preview limit. Each schedule returns at most the selected number of occurrences, up to 200. For a frequent interval, they may all fall in one day. The date range beneath the calendar makes that truncation visible; it is not a claim that the schedule ends there.

For one-shots, there is no second occurrence regardless of how large the count is. A zero interval is accepted by the native parser but cannot produce useful advancing dates. The preview exposes that result and stops rather than filling a calendar with identical instants.

Before relying on it

  1. Verify the schedule kind and several next occurrences.
  2. Repeat with a realistic nonzero task duration.
  3. Check the timezone, particularly around a clock change.
  4. Create a small real test in your own Hermes installation, then inspect actual execution and delivery separately.

The implementation reference is 0.22.2’s completed-run recording, advancement and next-run functions. For operational missed-fire behavior, use the documentation for your installed version. See also the exact engine and verification scope.

Three runs, three durations

A changing duration can hide inside an average.

Use an original hand-calculated example: both schedules first start at 12:30 UTC. The first run lasts two minutes, the second lasts 38 minutes and the third lasts four minutes. This sequence is hypothetical; it is not a record of Hermes execution. The calendar accepts one constant duration, so use this written trace to understand what that simplifying assumption leaves out.

Successful sequential runs; 30-minute interval versus half-hour cron boundaries
RunDurationInterval start → finishCron start → finish
12 min12:30 → 12:3212:30 → 12:32
238 min13:02 → 13:4013:00 → 13:38
34 min14:10 → 14:1414:00 → 14:04
Next startNot assumed14:4414:30

For the interval, add 30 minutes to each finish. For cron, find the next half-hour boundary strictly after that finish in this example. The long second run crosses 13:30; this sequential calculation therefore advances to 14:00. It does not place a second task at 13:30 while the first is still running.

The arithmetic average is 14 minutes 40 seconds, but substituting that value everywhere gives a different sequence. In particular, cron would not cross the same clock boundary on its second run. Average runtime is a useful summary of completed work; it is not enough to reconstruct the time of every future occurrence.

Choose a rehearsal that answers your actual question.

If you need a quiet interval after work finishes, compare the interval with both a short and a long duration. If you need output ready by a wall-clock deadline, write the deadline separately and compare it with completion, not merely the start shown in the calendar. Neither strategy promises completion by a deadline when task duration is unknown.

For a real trial, keep four timestamps per run: nominal due time, observed start, observed completion and observed delivery. A 12:30 due time, 12:34 start, 12:39 completion and 12:41 inbox receipt describe three different delays. Changing the schedule expression cannot by itself identify which delay caused a late message.

Keep this arithmetic trace and the four-timestamp trial sheet. It contains no executable scheduling command. Compare it with the delivery rehearsal before asking a real agent to send anything.

Next note: elapsed days and local mornings →